NEWTON Deliverables

D1.2 - First project period report summary (This report will be available in December 2017)
D1.4 - Second project period report summary (This report will be available in December 2018)
D1.6 - Project final report summary (This report will be available in November 2019)
D2.1 - Definition of instrument requirements and architecture. Design guidelines
D2.2 - Updated requirements and objectives for short-term scenarios (This report will be available in May 2018)
D2.3 - Updated requirements and objectives for long-term scenarios (This report will be available in May 2018)
D3.1 - Preliminary design report for the magnetic head
D3.2 - Preliminary design report for the electronic control block
D3.3 - Preliminary design report for the power distribution block
D3.4 - Final design and validation report for the magnetic head (This report will be available in May 2018)
D3.5 - Final design and validation report for the electronic control block (This report will be available in May 2018)
D3.6 - Final design and validation report for the power distribution block (This report will be available in May 2018)
D4.1- System integration report (This report will be available in July 2018)
D4.2 - Calibration and functional verification (This report will be available in November 2018)
D5.1 - Performance validation for future planetary exploration missions (This report will be available in November 2019)
D5.2 - Multi-sensor instrument validation (This report will be available in November 2019)
D5.3 - Capabilities for civil engineering applications (This report will be available in November 2019)